How to find a construction supervisor? Where to consult?
Why is there a job control engineer??
Why waste money to hire??
Today I have an answer:)
• • • • • • • • • • • • • • • • • • • • • •
For those who have dreams of having a house
Walking in to check the progress
The house is slowly taking shape.
It's considered a pleasure and no less exciting.
Many therefore choose to spend the holidays.
Or frequented the job site every evening.
To "walk in front of the job yourself."
But long enough days
Many homes go through the unexpected.
Like a crack house, a slant wall, a mismatch.
Or get more statements, little by little
Equally, it escalated to a shock.
Why is that?
Even though the landlord is diligent to watch the page almost every day
These problems arise because
Many people still misunderstand that.
Stopping by to see the page yourself
It's equal to "controlling construction."
Which, in fact,
These two things are very different.
🟠. Walking in front of the job.
Is to look at it with the naked eye at the consumer's point of view.
We went to see if the plasterer today
Is the bedroom wall up the frame yet?
Do you feel beautiful?
Which is a quantitative review of progress.
And the external image is essentially
🟠 Construction Control
Is technical work.
By a professional engineer.
The main function is to monitor.
• Structural quality
• Engineering accuracy
• Consistency with the construction model
Which requires level instrumentation.
Material knowledge
Construction Standard
And based on the real job experience I've experienced.
Using "naked eyes" to check the page
There are often many important points that novice homeowners often overlook.
Such as
• Steel structures and systems works that have been landfilled
When the mechanic pours the concrete floor over,
Or plastered over the pipe line
And the wires are done.
We'll never be able to know that.
Is there a reinforced steel tie inside, according to the specification?
Has the spur iron been fully inserted?
Or is the plumbing leaking inside?
I realized when the house was in trouble.
Which may be too late to fix.
• Plumeness, scene and level
Looking at it with the naked eye is often unspeakable.
Whether the wall is actually perpendicular.
Does the floor have the right incline?
These mistakes will continue to affect.
When the process of installing Bi-in furniture is reached,
Tile or sanitary installation
• Reduced quality and specification of materials
Sometimes, materials of a grade not equal to that agreed in the contract may be used.
For example, the thickness of the rebar does not reach
Or each cement is compressing
If you find a good contractor, good luck.
But if you don't meet well, that's it.
According to many cases of experience,
Anyway,
Going "walk in front of the job itself" is good.
Because it allows us to see progress.
And build a good relationship with the supervisor.
But if you want this house to be healthy,
Safe and with us for generations.
Having a specialist to control the construction work.
So it's something not to be overlooked. 👷🏼♂️
• • • • • • • • • • • • • • • • • • • • • •
Think of supervising. No time to take care of yourself.
Or housing problems.
Let us be your comfort.
"N36 Engineering Co., Ltd."