What is the pile layout? Before going down the pile, what to see??
After finishing the pile...
Next, we need to check the layout of the previous layout.
• • First House, Episode 10 • •
Pile Layout
🟠 must be done before going down the pile to determine the location of each plant on the construction site as specified in the construction design (Shop Drawing).
To make the transfer of structural weight down to the pile follow the engineering design.
🔺 The main purpose of pile planning.
• Correct to the pattern
• To effectively and safely descend the pile in the designated position
• In the case of group piles, each pile will not squeeze or collide underground.
🟠 need to check the back down the pile again. It's a so-called "As-Built" check to compare the actual mountable pile position to the defined position in the model.
🔺 main point to check behind the pile.
• Position and indentation according to project standards and designer engineer
❌ If the indented pile exceeds the acceptable value, the load bearing foundation is asymmetrical.
• Check for acceptable tilt
❌ If the pile is tilted too much, it may reduce the bearing capacity of the pile.
• Pile integrity
The layout and re-examination of the piling position after the piling is completed is an important and essential step in foundation engineering. It cannot be ignored.
.
.
Think about work, no time or housing problems. Think about it.
"N36 Engineering Co., Ltd."



























































































































